SR 112 over Sekiu River
Good Condition44 years old881 vehicles/day
Location
| State | Washington |
| County | Clallam |
| Location | 9.6 E Makah Res |
| Carries | SR 112 |
| Crosses | Sekiu River |
| Coordinates | 48.28796, -124.39603 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 317.9 ft (96.9 m) |
| Max Span | 122.0 ft (37.2 m) |
| Deck Width | 35.1 ft (10.7 m) |
| Deck Area | 1036.8 sq m |
| Main Spans | 3 |
| Year Built | 1982 |
Traffic
| Avg Daily Traffic | 881 (2023) |
| Truck Traffic | 9% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 0012080A0000000 |