US 2 over Blewett Cutoff RD
Good Condition18 years old14,792 vehicles/day
Location
| State | Washington |
| County | Chelan |
| Location | 19.4 E Jct SR 207 |
| Carries | US 2 |
| Crosses | Blewett Cutoff RD |
| Coordinates | 47.56236, -120.59872 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 85.0 ft (25.9 m) |
| Max Span | 80.1 ft (24.4 m) |
| Deck Width | 64.0 ft (19.5 m) |
| Deck Area | 505.1 sq m |
| Main Spans | 1 |
| Year Built | 2008 |
Traffic
| Avg Daily Traffic | 14,792 (2023) |
| Truck Traffic | 6% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 1 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 0017418A0000000 |