I-405-SR 520 Nbcd over I-405 N-e & N-w Ramps
Good Condition15 years old9,875 vehicles/day
Location
| State | Washington |
| County | King |
| Location | 3.1 N Jct I-90 |
| Carries | I-405-SR 520 Nbcd |
| Crosses | I-405 N-e & N-w Ramps |
| Coordinates | 47.62333, -122.18821 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 440.0 ft (134.1 m) |
| Max Span | 138.1 ft (42.1 m) |
| Deck Width | 26.9 ft (8.2 m) |
| Deck Area | 1099.6 sq m |
| Main Spans | 4 |
| Year Built | 2011 |
Traffic
| Avg Daily Traffic | 9,875 (2023) |
| Truck Traffic | 3% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 0017726G0000000 |