US 395 over Fairview RD
Good Condition14 years old6,253 vehicles/day
Location
| State | Washington |
| County | Spokane |
| Location | 6.3 N Jct I-90 |
| Carries | US 395 |
| Crosses | Fairview RD |
| Coordinates | 47.74247, -117.36072 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 145.0 ft (44.2 m) |
| Max Span | 139.1 ft (42.4 m) |
| Deck Width | 59.1 ft (18 m) |
| Deck Area | 795.6 sq m |
| Main Spans | 1 |
| Year Built | 2012 |
Traffic
| Avg Daily Traffic | 6,253 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 0017967C0000000 |