Stanwood-bryant RD over Pilchuck Creek
Good Condition30 years old4,922 vehicles/day
Location
| State | Washington |
| County | Snohomish |
| Location | 2.0 E Jct I-5 |
| Carries | Stanwood-bryant RD |
| Crosses | Pilchuck Creek |
| Coordinates | 48.23889, -122.20556 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 279.9 ft (85.3 m) |
| Max Span | 137.5 ft (41.9 m) |
| Deck Width | 37.1 ft (11.3 m) |
| Deck Area | 963.9 sq m |
| Main Spans | 2 |
| Year Built | 1996 |
Traffic
| Avg Daily Traffic | 4,922 (2023) |
| Truck Traffic | 15% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 086204000000000 |