25th AVE West over Powder Mill Gulch
Fair Condition33 years old15 vehicles/day
Location
| State | Washington |
| County | Snohomish |
| Location | South Of 56th |
| Carries | 25th AVE West |
| Crosses | Powder Mill Gulch |
| Coordinates | 47.94694, -122.26639 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 6 — Scour calculated, stable |
Physical Characteristics
| Material | Steel |
| Design | Culvert |
| Total Length | 39.0 ft (11.9 m) |
| Max Span | 39.0 ft (11.9 m) |
| Deck Area | 130.9 sq m |
| Main Spans | 1 |
| Year Built | 1993 |
Traffic
| Avg Daily Traffic | 15 (2020) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 086225000000000 |