S. First ST over Snipes Mtn Lateral Canal
Good Condition29 years old2,670 vehicles/day
Location
| State | Washington |
| County | Yakima |
| Location | 0.01 S SW Crescent |
| Carries | S. First ST |
| Crosses | Snipes Mtn Lateral Canal |
| Coordinates | 46.31833, -120.02167 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 28.9 ft (8.8 m) |
| Max Span | 27.9 ft (8.5 m) |
| Deck Width | 49.9 ft (15.2 m) |
| Deck Area | 133.8 sq m |
| Main Spans | 1 |
| Year Built | 1997 |
Traffic
| Avg Daily Traffic | 2,670 (2019) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2022 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 086291000000000 |