Eastmont Avenue over Canyon B Drainage

Good Condition14 years old8,295 vehicles/day

Location

StateWashington
CountyDouglas
LocationCanyon B
CarriesEastmont Avenue
CrossesCanyon B Drainage
Coordinates47.45764, -120.29131

Condition Ratings

Overall ConditionGood
Deck8 (Very Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical9 — Foundation above flood level

Physical Characteristics

MaterialConcrete Continuous
DesignArch - Deck
Total Length597.1 ft (182 m)
Max Span238.8 ft (72.8 m)
Deck Width59.4 ft (18.1 m)
Deck Area3294.2 sq m
Main Spans1
Year Built2012

Traffic

Avg Daily Traffic8,295 (2020)
Truck Traffic16%
Lanes On Bridge3

Inspection & Ownership

Last Inspection423
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number088534000000000

Nearby Bridges