S Razor Clam DR SW over Lake Minard Canal
Good Condition8 years old525 vehicles/day
Location
| State | Washington |
| County | Grays Harbor |
| Location | 0.35 W Pt Brown AVE |
| Carries | S Razor Clam DR SW |
| Crosses | Lake Minard Canal |
| Coordinates | 46.95986, -124.15783 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 9 — Foundation above flood level |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 121.1 ft (36.9 m) |
| Max Span | 116.1 ft (35.4 m) |
| Deck Width | 39.0 ft (11.9 m) |
| Deck Area | 439.1 sq m |
| Main Spans | 1 |
| Year Built | 2018 |
Traffic
| Avg Daily Traffic | 525 (2022) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 089014000000000 |