State Route 74 over Hot Springs Canyon

Fair Condition35 years old9,800 vehicles/day

Location

StateCalifornia
CountyOrange
Location12-ora-074-12.34-sjcp
CarriesState Route 74
CrossesHot Springs Canyon
Coordinates33.58902, -117.51572

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure7 (Good)
Substructure5 (Fair)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length105.0 ft (32 m)
Max Span100.1 ft (30.5 m)
Deck Width43.6 ft (13.3 m)
Deck Area425.6 sq m
Main Spans1
Year Built1991

Traffic

Avg Daily Traffic9,800 (2014)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number55 0063

Nearby Bridges