Interstate 5 over Avenida Palizada
Good Condition66 years old155,000 vehicles/day
Location
| State | California |
| County | Orange |
| Location | 12-ora-005-2.66-scle |
| Carries | Interstate 5 |
| Crosses | Avenida Palizada |
| Coordinates | 33.43091, -117.61402 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 163.1 ft (49.7 m) |
| Max Span | 90.9 ft (27.7 m) |
| Deck Width | 151.9 ft (46.3 m) |
| Deck Area | 2301.1 sq m |
| Main Spans | 3 |
| Year Built | 1960 (reconstructed 1981) |
Traffic
| Avg Daily Traffic | 155,000 (2024) |
| Truck Traffic | 8% |
| Lanes On Bridge | 9 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 55 0205 |