Interstate 5 over Bnsf Ry Amtrak Metrolink
Good Condition67 years old213,000 vehicles/day
Location
| State | California |
| County | Orange |
| Location | 12-ora-005-16.36-lgnh |
| Carries | Interstate 5 |
| Crosses | Bnsf Ry Amtrak Metrolink |
| Coordinates | 33.59652, -117.67429 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 228.3 ft (69.6 m) |
| Max Span | 79.7 ft (24.3 m) |
| Deck Width | 236.2 ft (72 m) |
| Deck Area | 5011.2 sq m |
| Main Spans | 3 |
| Year Built | 1959 (reconstructed 2023) |
Traffic
| Avg Daily Traffic | 213,000 (2022) |
| Truck Traffic | 7% |
| Lanes On Bridge | 16 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 55 0221 |