IH 41/ush 45/sth 1 over Lrd Carmen Avenue
Fair Condition26 years old55,000 vehicles/day
Location
| State | Wisconsin |
| County | Milwaukee |
| Location | 1.1 Mi S Jct Ush41/sth175 |
| Carries | IH 41/ush 45/sth 1 |
| Crosses | Lrd Carmen Avenue |
| Coordinates | 43.12302, -88.05718 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 128.9 ft (39.3 m) |
| Max Span | 57.1 ft (17.4 m) |
| Deck Width | 58.4 ft (17.8 m) |
| Deck Area | 699.5 sq m |
| Main Spans | 3 |
| Year Built | 2000 |
Traffic
| Avg Daily Traffic | 55,000 (2023) |
| Truck Traffic | 3% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | B40021300000000 |