IH 90 Eb-ih 94 EB over Lrd Schepp RD
Fair Condition65 years old19,750 vehicles/day
Location
| State | Wisconsin |
| County | Sauk |
| Location | 7.6m E Jct Ush 12 To E |
| Carries | IH 90 Eb-ih 94 EB |
| Crosses | Lrd Schepp RD |
| Coordinates | 43.54668, -89.63657 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 110.2 ft (33.6 m) |
| Max Span | 41.3 ft (12.6 m) |
| Deck Width | 58.1 ft (17.7 m) |
| Deck Area | 594.7 sq m |
| Main Spans | 3 |
| Year Built | 1961 (reconstructed 1992) |
Traffic
| Avg Daily Traffic | 19,750 (2022) |
| Truck Traffic | 18% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | B56002400000000 |