Toledo Way over Serrano Creek Channel
Good Condition46 years old6,100 vehicles/day
Location
| State | California |
| County | Orange |
| Location | 100 W/o Bake Parkway |
| Carries | Toledo Way |
| Crosses | Serrano Creek Channel |
| Coordinates | 33.65028, -117.70739 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 9 (Excellent) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 39.0 ft (11.9 m) |
| Max Span | 12.1 ft (3.7 m) |
| Deck Width | 123.4 ft (37.6 m) |
| Deck Area | 447.4 sq m |
| Main Spans | 3 |
| Year Built | 1980 |
Traffic
| Avg Daily Traffic | 6,100 (2018) |
| Truck Traffic | 7% |
| Lanes On Bridge | 7 |
Inspection & Ownership
| Last Inspection | 422 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 55C0483 |