IRR BIA RTE 140 over Dry Creek

Good Condition30 years old20 vehicles/day

Location

StateWyoming
CountyFremont
Location11 Km NE Of Jct 23 & 140
CarriesIRR BIA RTE 140
CrossesDry Creek
Coordinates43.53164, -109.09572

Condition Ratings

Overall ConditionGood
Deck8 (Very Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignTee Beam
Total Length24.0 ft (7.3 m)
Max Span23.3 ft (7.1 m)
Deck Width29.9 ft (9.1 m)
Deck Area66.4 sq m
Main Spans1
Year Built1996

Traffic

Avg Daily Traffic20 (2024)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last Inspection524
Inspection FrequencyEvery 24 months
OwnerBureau of Indian Affairs
Historical SignificanceBridge is not eligible for the National Register
Structure Number00000000000C835