I-80 Ebl over CR 57 (dutton Creek Rd)
Fair Condition57 years old5,162 vehicles/day
Location
| State | Wyoming |
| County | Albany |
| Location | Rawlins - Laramie |
| Carries | I-80 Ebl |
| Crosses | CR 57 (dutton Creek Rd) |
| Coordinates | 41.51362, -106.05494 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 133.9 ft (40.8 m) |
| Max Span | 56.1 ft (17.1 m) |
| Deck Width | 42.7 ft (13 m) |
| Deck Area | 530.4 sq m |
| Main Spans | 3 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 5,162 (2024) |
| Truck Traffic | 67% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | AWC |