I-90 Ebl over Tongue River

Fair Condition66 years old3,900 vehicles/day

Location

StateWyoming
CountySheridan
LocationMontana Line - Sheridan
CarriesI-90 Ebl
CrossesTongue River
Coordinates44.90087, -107.02104

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length312.7 ft (95.3 m)
Max Span119.1 ft (36.3 m)
Deck Width51.2 ft (15.6 m)
Deck Area1486.7 sq m
Main Spans3
Year Built1960 (reconstructed 2004)

Traffic

Avg Daily Traffic3,900 (2024)
Truck Traffic17%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure NumberBAZ

Nearby Bridges