I-90 Wbl over Jo CR 85 (shell Creek)

Fair Condition60 years old3,705 vehicles/day

Location

StateWyoming
CountyJohnson
LocationSheridan - Buffalo
CarriesI-90 Wbl
CrossesJo CR 85 (shell Creek)
Coordinates44.47738, -106.79751

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length102.0 ft (31.1 m)
Max Span40.0 ft (12.2 m)
Deck Width40.4 ft (12.3 m)
Deck Area382.5 sq m
Main Spans3
Year Built1966

Traffic

Avg Daily Traffic3,705 (2024)
Truck Traffic18%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure NumberBCW

Nearby Bridges