I-90 Ebl over Jo CR 204a (dry Creek)
Fair Condition65 years old1,533 vehicles/day
Location
| State | Wyoming |
| County | Johnson |
| Location | Buffalo - Gillette |
| Carries | I-90 Ebl |
| Crosses | Jo CR 204a (dry Creek) |
| Coordinates | 44.23496, -106.39199 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 93.5 ft (28.5 m) |
| Max Span | 35.1 ft (10.7 m) |
| Deck Width | 41.0 ft (12.5 m) |
| Deck Area | 356.2 sq m |
| Main Spans | 3 |
| Year Built | 1961 |
Traffic
| Avg Daily Traffic | 1,533 (2024) |
| Truck Traffic | 19% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | BED |