Fr Cnty RD 448 over Pilot Canal
Fair Condition47 years old81 vehicles/day
Location
| State | Wyoming |
| County | Fremont |
| Location | 22 Mi. N.w. Of Riverton |
| Carries | Fr Cnty RD 448 |
| Crosses | Pilot Canal |
| Coordinates | 43.19364, -108.75042 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 75.1 ft (22.9 m) |
| Max Span | 73.2 ft (22.3 m) |
| Deck Width | 28.5 ft (8.7 m) |
| Deck Area | 199.2 sq m |
| Main Spans | 1 |
| Year Built | 1979 |
Traffic
| Avg Daily Traffic | 81 (2024) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | DIN |