US 287 over M Fork Popo Agie River

Fair Condition48 years old17,932 vehicles/day

Location

StateWyoming
CountyFremont
LocationLander Streets
CarriesUS 287
CrossesM Fork Popo Agie River
Coordinates42.83219, -108.72668

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure8 (Very Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length99.1 ft (30.2 m)
Max Span38.1 ft (11.6 m)
Deck Width86.0 ft (26.2 m)
Deck Area791.2 sq m
Main Spans3
Year Built1978

Traffic

Avg Daily Traffic17,932 (2024)
Truck Traffic3%
Lanes On Bridge5

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure NumberDIY

Nearby Bridges