State Route 60 over Camino Real
Fair Condition51 years old237,000 vehicles/day
Location
| State | California |
| County | Riverside |
| Location | 08-riv-060-r6.31 |
| Carries | State Route 60 |
| Crosses | Camino Real |
| Coordinates | 34.01404, -117.45028 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 152.9 ft (46.6 m) |
| Max Span | 145.0 ft (44.2 m) |
| Deck Width | 164.0 ft (50 m) |
| Deck Area | 2,330 sq m |
| Main Spans | 1 |
| Year Built | 1975 (reconstructed 2008) |
Traffic
| Avg Daily Traffic | 237,000 (2020) |
| Truck Traffic | 13% |
| Lanes On Bridge | 10 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 56 0661 |