SW Cnty RD 51 over Little Bitter Creek
Poor Condition51 years old2,241 vehicles/day
Location
| State | Wyoming |
| County | Sweetwater |
| Location | 6.5 Mi.sw Of Rock Springs |
| Carries | SW Cnty RD 51 |
| Crosses | Little Bitter Creek |
| Coordinates | 41.55860, -109.27735 |
Condition Ratings
| Overall Condition | Poor |
| Deck | 6 (Satisfactory) |
| Superstructure | 4 (Poor) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Channel Beam |
| Total Length | 87.9 ft (26.8 m) |
| Max Span | 24.0 ft (7.3 m) |
| Deck Width | 33.1 ft (10.1 m) |
| Deck Area | 270.7 sq m |
| Main Spans | 3 |
| Year Built | 1975 |
Traffic
| Avg Daily Traffic | 2,241 (2024) |
| Truck Traffic | 15% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | ETO |