SB Cnty RD 150 over Apex Ditch
Fair Condition37 years old60 vehicles/day
Location
| State | Wyoming |
| County | Sublette |
| Location | 7 Mi. N.w. Of Daniel Jct |
| Carries | SB Cnty RD 150 |
| Crosses | Apex Ditch |
| Coordinates | 42.99264, -110.11599 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | Unknown |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 30.8 ft (9.4 m) |
| Max Span | 28.9 ft (8.8 m) |
| Deck Width | 24.9 ft (7.6 m) |
| Deck Area | 71.4 sq m |
| Main Spans | 1 |
| Year Built | 1989 |
Traffic
| Avg Daily Traffic | 60 (2024) |
| Truck Traffic | 25% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | FLT |