SH Cnty RD 269 over Powder River

Fair Condition37 years old121 vehicles/day

Location

StateWyoming
CountySheridan
Location16 Miles N. Of Arvada
CarriesSH Cnty RD 269
CrossesPowder River
Coordinates44.87964, -106.06231

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length393.0 ft (119.8 m)
Max Span150.9 ft (46 m)
Deck Width28.5 ft (8.7 m)
Deck Area1042.3 sq m
Main Spans3
Year Built1989

Traffic

Avg Daily Traffic121 (2024)
Truck Traffic9%
Lanes On Bridge2

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberFNH