Route 74 over Leach Canyon Channel

Fair Condition49 years old29,500 vehicles/day

Location

StateCalifornia
CountyRiverside
Location08-riv-074-13.23-esn
CarriesRoute 74
CrossesLeach Canyon Channel
Coordinates33.67331, -117.37662

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignSlab
Total Length33.5 ft (10.2 m)
Max Span31.5 ft (9.6 m)
Deck Width64.0 ft (19.5 m)
Deck Area198.9 sq m
Main Spans1
Year Built1977 (reconstructed 1986)

Traffic

Avg Daily Traffic29,500 (2019)
Truck Traffic8%
Lanes On Bridge3

Inspection & Ownership

Last Inspection623
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number56 0750

Nearby Bridges