SB Cnty RD 123 over New Fork River

Poor Condition31 years old869 vehicles/day

Location

StateWyoming
CountySublette
Location2 Iles South Of Pinedale
CarriesSB Cnty RD 123
CrossesNew Fork River
Coordinates42.83755, -109.86374

Condition Ratings

Overall ConditionPoor
Deck4 (Poor)
Superstructure5 (Fair)
Substructure5 (Fair)
Channel/Waterway6 (Satisfactory)
Scour CriticalUnknown

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length61.0 ft (18.6 m)
Max Span61.0 ft (18.6 m)
Deck Width24.3 ft (7.4 m)
Deck Area137.6 sq m
Main Spans1
Year Built1995

Traffic

Avg Daily Traffic869 (2024)
Truck Traffic8%
Lanes On Bridge2

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceHistorical significance is not determined
Structure NumberKIK

Nearby Bridges