Pr 30 5.50 Km over Creek
Fair Condition58 years old114,500 vehicles/day
Location
| State | Puerto Rico |
| County | Gurabo Municipio |
| Location | 2 Km South West Of Gurabo |
| Carries | Pr 30 5.50 Km |
| Crosses | Creek |
| Coordinates | 18.24716, -65.98987 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 4 (Poor) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 33.1 ft (10.1 m) |
| Max Span | 16.7 ft (5.1 m) |
| Deck Area | 263.6 sq m |
| Main Spans | 2 |
| Year Built | 1968 |
Traffic
| Avg Daily Traffic | 114,500 (2017) |
| Truck Traffic | 4% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 011381 |