Off Pr 866 over Creek
Fair Condition37 years old250 vehicles/day
Location
| State | Puerto Rico |
| County | Toa Baja Municipio |
| Location | At South Of Pr 22 |
| Carries | Off Pr 866 |
| Crosses | Creek |
| Coordinates | 18.41839, -66.19130 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 96.5 ft (29.4 m) |
| Max Span | 89.9 ft (27.4 m) |
| Deck Width | 77.8 ft (23.7 m) |
| Deck Area | 696.8 sq m |
| Main Spans | 1 |
| Year Built | 1989 |
Traffic
| Avg Daily Traffic | 250 (2005) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 019381 |