Pr 53 Westbound over Hucar Creek
Fair Condition34 years old9,050 vehicles/day
Location
| State | Puerto Rico |
| County | Salinas Municipio |
| Location | 7 Km Northwest Of Salinas |
| Carries | Pr 53 Westbound |
| Crosses | Hucar Creek |
| Coordinates | 17.99954, -66.23699 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 100.4 ft (30.6 m) |
| Max Span | 95.8 ft (29.2 m) |
| Deck Width | 44.3 ft (13.5 m) |
| Deck Area | 413.1 sq m |
| Main Spans | 1 |
| Year Built | 1992 |
Traffic
| Avg Daily Traffic | 9,050 (2017) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 019552 |