Pr 53 Westbound over Hucar Creek

Fair Condition34 years old9,050 vehicles/day

Location

StatePuerto Rico
CountySalinas Municipio
Location7 Km Northwest Of Salinas
CarriesPr 53 Westbound
CrossesHucar Creek
Coordinates17.99954, -66.23699

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length100.4 ft (30.6 m)
Max Span95.8 ft (29.2 m)
Deck Width44.3 ft (13.5 m)
Deck Area413.1 sq m
Main Spans1
Year Built1992

Traffic

Avg Daily Traffic9,050 (2017)
Truck Traffic4%
Lanes On Bridge2

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number019552

Nearby Bridges