Pr 727 over Honda River

Fair Condition34 years old1,000 vehicles/day

Location

StatePuerto Rico
CountyAibonito Municipio
Location3 Km N E Of Aibonito
CarriesPr 727
CrossesHonda River
Coordinates18.15817, -66.23076

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical3 — Scour critical

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length80.4 ft (24.5 m)
Max Span80.4 ft (24.5 m)
Deck Width30.8 ft (9.4 m)
Deck Area230.3 sq m
Main Spans1
Year Built1992

Traffic

Avg Daily Traffic1,000 (2017)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number022141

Nearby Bridges