Pr 22 Westbound over Pr 659
Fair Condition35 years old26,550 vehicles/day
Location
| State | Puerto Rico |
| County | Dorado Municipio |
| Location | 5 Km South West Of Dorado |
| Carries | Pr 22 Westbound |
| Crosses | Pr 659 |
| Coordinates | 18.42662, -66.27956 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 100.1 ft (30.5 m) |
| Max Span | 96.1 ft (29.3 m) |
| Deck Width | 58.1 ft (17.7 m) |
| Deck Area | 539.9 sq m |
| Main Spans | 1 |
| Year Built | 1991 |
Traffic
| Avg Daily Traffic | 26,550 (2017) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 022262 |