Pr-834 over Waterway
Fair Condition23 years old4,900 vehicles/day
Location
| State | Puerto Rico |
| County | Guaynabo Municipio |
| Location | 4 Kms. South Of Guaynabo |
| Carries | Pr-834 |
| Crosses | Waterway |
| Coordinates | 18.32722, -66.10000 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 1323.2 ft (403.3 m) |
| Max Span | 131.2 ft (40 m) |
| Deck Width | 85.0 ft (25.9 m) |
| Deck Area | 10445.5 sq m |
| Main Spans | 13 |
| Year Built | 2003 |
Traffic
| Avg Daily Traffic | 4,900 (2017) |
| Truck Traffic | 5% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 026631 |