Sunrise Way over Tahquitz Creek
Fair Condition41 years old18,143 vehicles/day
Location
| State | California |
| County | Riverside |
| Location | 0.4 Mi. S/o Ramon Road |
| Carries | Sunrise Way |
| Crosses | Tahquitz Creek |
| Coordinates | 33.81023, -116.52808 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 153.9 ft (46.9 m) |
| Max Span | 57.1 ft (17.4 m) |
| Deck Width | 78.1 ft (23.8 m) |
| Deck Area | 1116.2 sq m |
| Main Spans | 3 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 18,143 (2020) |
| Truck Traffic | 1% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 225 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 56C0351 |