College AVE over Interstate 8
Good Condition66 years old28,740 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | 11-sd-008-8.34-sd |
| Carries | College AVE |
| Crosses | Interstate 8 |
| Coordinates | 32.77980, -117.06623 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 316.9 ft (96.6 m) |
| Max Span | 84.0 ft (25.6 m) |
| Deck Width | 64.3 ft (19.6 m) |
| Deck Area | 1893.4 sq m |
| Main Spans | 4 |
| Year Built | 1960 (reconstructed 1970) |
Traffic
| Avg Daily Traffic | 28,740 (2014) |
| Truck Traffic | 4% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 12 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57 0367 |