Camino Del Rio-e8 over I 5 Bnsf Amtrak Mtdb Lrt
Good Condition57 years old10,300 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | 11-sd-008-l2.35-sd |
| Carries | Camino Del Rio-e8 |
| Crosses | I 5 Bnsf Amtrak Mtdb Lrt |
| Coordinates | 32.75750, -117.20401 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 1190.0 ft (362.7 m) |
| Max Span | 119.1 ft (36.3 m) |
| Deck Width | 40.0 ft (12.2 m) |
| Deck Area | 4424.9 sq m |
| Main Spans | 11 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 10,300 (2014) |
| Truck Traffic | 1% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 14 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57 0551G |