S805-e&w54 Connect over Euclid Av Sweetwater RD
Good Condition52 years old23,500 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | 11-sd-805-9.07-natc |
| Carries | S805-e&w54 Connect |
| Crosses | Euclid Av Sweetwater RD |
| Coordinates | 32.66114, -117.07790 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 669.9 ft (204.2 m) |
| Max Span | 136.2 ft (41.5 m) |
| Deck Width | 42.3 ft (12.9 m) |
| Deck Area | 2634.2 sq m |
| Main Spans | 6 |
| Year Built | 1974 |
Traffic
| Avg Daily Traffic | 23,500 (2020) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 9 |
Inspection & Ownership
| Last Inspection | 624 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57 0640F |