Interstate 805 over Plaza BLVD
Fair Condition51 years old204,000 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | 11-sd-805-10.28-natc |
| Carries | Interstate 805 |
| Crosses | Plaza BLVD |
| Coordinates | 32.67722, -117.08461 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 151.9 ft (46.3 m) |
| Max Span | 151.9 ft (46.3 m) |
| Deck Width | 171.9 ft (52.4 m) |
| Deck Area | 2426.1 sq m |
| Main Spans | 1 |
| Year Built | 1975 |
Traffic
| Avg Daily Traffic | 204,000 (2020) |
| Truck Traffic | 6% |
| Lanes On Bridge | 12 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57 0643 |