Interstate 8 WB over State Route 79
Good Condition56 years old11,050 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | 11-sd-008-r37.83 |
| Carries | Interstate 8 WB |
| Crosses | State Route 79 |
| Coordinates | 32.82740, -116.62546 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 133.9 ft (40.8 m) |
| Max Span | 131.9 ft (40.2 m) |
| Deck Width | 41.0 ft (12.5 m) |
| Deck Area | 510 sq m |
| Main Spans | 1 |
| Year Built | 1970 |
Traffic
| Avg Daily Traffic | 11,050 (2014) |
| Truck Traffic | 12% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 124 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57 0689L |