Mission Gorge RD over Forester Creek
Fair Condition67 years old10,997 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | 0.7mi W/o Cuyamaca ST |
| Carries | Mission Gorge RD |
| Crosses | Forester Creek |
| Coordinates | 32.83852, -116.99711 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 196.9 ft (60 m) |
| Max Span | 39.4 ft (12 m) |
| Deck Width | 102.4 ft (31.2 m) |
| Deck Area | 1,872 sq m |
| Main Spans | 6 |
| Year Built | 1959 (reconstructed 2008) |
Traffic
| Avg Daily Traffic | 10,997 (2022) |
| Truck Traffic | 5% |
| Lanes On Bridge | 6 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57C0166 |