Camino Del Mar over Mtdb Bnsf Ry & Amtrak
Fair Condition99 years old12,100 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | At Jimmy Durante BLVD |
| Carries | Camino Del Mar |
| Crosses | Mtdb Bnsf Ry & Amtrak |
| Coordinates | 32.96532, -117.26526 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete |
| Design | Tee Beam |
| Total Length | 267.1 ft (81.4 m) |
| Max Span | 50.9 ft (15.5 m) |
| Deck Width | 56.1 ft (17.1 m) |
| Deck Area | 1391.9 sq m |
| Main Spans | 8 |
| Year Built | 1927 (reconstructed 1936) |
Traffic
| Avg Daily Traffic | 12,100 (2020) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 1 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57C0208 |