Tulip ST over Escondido Creek
Fair Condition59 years old14,200 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | 0.12m N/o Valley PKWY |
| Carries | Tulip ST |
| Crosses | Escondido Creek |
| Coordinates | 33.11863, -117.09675 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 112.9 ft (34.4 m) |
| Max Span | 55.1 ft (16.8 m) |
| Deck Width | 80.1 ft (24.4 m) |
| Deck Area | 839.4 sq m |
| Main Spans | 2 |
| Year Built | 1967 |
Traffic
| Avg Daily Traffic | 14,200 (2023) |
| Truck Traffic | 10% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57C0446 |