Rincon AVE over Grove Creek
Good Condition37 years old6,500 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | 0.3 Mi E Of N Broadway |
| Carries | Rincon AVE |
| Crosses | Grove Creek |
| Coordinates | 33.16167, -117.08888 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 9 (Excellent) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 122.0 ft (37.2 m) |
| Max Span | 24.9 ft (7.6 m) |
| Deck Width | 104.0 ft (31.7 m) |
| Deck Area | 1179.2 sq m |
| Main Spans | 4 |
| Year Built | 1989 |
Traffic
| Avg Daily Traffic | 6,500 (2023) |
| Truck Traffic | 2% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57C0599 |