Collier Way over Harbison Canyon Creek

Fair Condition19 years old117 vehicles/day

Location

StateCalifornia
CountySan Diego
Location25 Ft S/o Harbison Cyn RD
CarriesCollier Way
CrossesHarbison Canyon Creek
Coordinates32.81502, -116.83619

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure7 (Good)
Channel/Waterway9 (Excellent)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete
DesignSlab
Total Length44.9 ft (13.7 m)
Max Span40.0 ft (12.2 m)
Deck Width35.1 ft (10.7 m)
Deck Area146.6 sq m
Main Spans1
Year Built2007

Traffic

Avg Daily Traffic117 (2016)
Truck Traffic2%
Lanes On Bridge2

Inspection & Ownership

Last Inspection523
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number57C0714

Nearby Bridges