Falcon RD over Ironstone Canal
Fair Condition43 years old64 vehicles/day
Location
| State | Colorado |
| County | Montrose |
| Location | .5 Mi E Of CR 5825 |
| Carries | Falcon RD |
| Crosses | Ironstone Canal |
| Coordinates | 38.59081, -107.99369 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 30.5 ft (9.3 m) |
| Max Span | 28.5 ft (8.7 m) |
| Deck Width | 24.3 ft (7.4 m) |
| Deck Area | 68.8 sq m |
| Main Spans | 1 |
| Year Built | 1983 |
Traffic
| Avg Daily Traffic | 64 (2022) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 085002600.4064A |