I 25 Ml Sbnd over Co.rd 82 Buckeye Road
Fair Condition63 years old12,500 vehicles/day
Location
| State | Colorado |
| County | Larimer |
| Location | 11.3 Mi South Of Wyoming |
| Carries | I 25 Ml Sbnd |
| Crosses | Co.rd 82 Buckeye Road |
| Coordinates | 40.84115, -104.96632 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete |
| Design | Tee Beam |
| Total Length | 109.9 ft (33.5 m) |
| Max Span | 40.0 ft (12.2 m) |
| Deck Width | 42.0 ft (12.8 m) |
| Deck Area | 428.8 sq m |
| Main Spans | 3 |
| Year Built | 1963 |
Traffic
| Avg Daily Traffic | 12,500 (2020) |
| Truck Traffic | 14% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | A-17-AA |