E. Iliff Ave. over Highline Canal Trail
Fair Condition14 years old38,491 vehicles/day
Location
| State | Colorado |
| County | Arapahoe |
| Location | 0.5 W Of Parker Rd. |
| Carries | E. Iliff Ave. |
| Crosses | Highline Canal Trail |
| Coordinates | 39.67461, -104.88052 |
Condition Ratings
| Overall Condition | Fair |
| Culvert | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 25.6 ft (7.8 m) |
| Max Span | 25.6 ft (7.8 m) |
| Deck Width | 115.5 ft (35.2 m) |
| Deck Area | 274.6 sq m |
| Main Spans | 1 |
| Year Built | 2012 |
Traffic
| Avg Daily Traffic | 38,491 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | ARA 20-9.2W |