1st AVE over Highline Canal
Fair Condition43 years old2,949 vehicles/day
Location
| State | Colorado |
| County | Arapahoe |
| Location | 0.3 Mi E Of Chambers RD |
| Carries | 1st AVE |
| Crosses | Highline Canal |
| Coordinates | 39.71883, -104.80544 |
Condition Ratings
| Overall Condition | Fair |
| Superstructure | 6 (Satisfactory) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Arch - Deck |
| Total Length | 20.3 ft (6.2 m) |
| Max Span | 20.3 ft (6.2 m) |
| Deck Width | 66.3 ft (20.2 m) |
| Deck Area | 125.2 sq m |
| Main Spans | 1 |
| Year Built | 1983 |
Traffic
| Avg Daily Traffic | 2,949 (2021) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | AUR08.0-J.5 |