Alameda AVE over Highline Canal
Fair Condition56 years old31,795 vehicles/day
Location
| State | Colorado |
| County | Arapahoe |
| Location | 0.25 Mi E Of Havana |
| Carries | Alameda AVE |
| Crosses | Highline Canal |
| Coordinates | 39.71108, -104.86084 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 30.2 ft (9.2 m) |
| Max Span | 14.8 ft (4.5 m) |
| Deck Width | 98.8 ft (30.1 m) |
| Deck Area | 276.9 sq m |
| Main Spans | 2 |
| Year Built | 1970 |
Traffic
| Avg Daily Traffic | 31,795 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 6 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | AUR09.0-C.5 |